Interior Gym Upfit - Thomasville NC - 2025
It all begins with an idea.
Material & labor furnished:
- Interior demolition (removal of interior partitions, ceilings, and floor finishes at required areas)
- 20 gauge light steel stud framing
- Batt insulation
- Gypsum wallboard & fire rated plywood backing
- Level 4 gypsum wallboard finishing
- Drop ceiling (15/16” ceiling grid w/ typical 2x2 square edge tiles)
Labor furnished:
- Installation of hollow metal doors (frame & jambs only)
- Installation of Acrovyn wall panels